Trolley Mounted / Skid Mounted
Applications:
Reddy Compressors pioneered the Engine Screw Air Compressor in India. Our expertise in the highly demanding water well drilling application in a variety of difficult strata have enabled us to tropicalise screw compressors to full load conditions. The Reddy Compressors range of Engine Driven Mobile Air compressors (trolley mounted) are working successfully in applications such as road building, construction, mining, quarry, sand blasting and many more. They are designed to withstand extremes of temperature, dust, grims and tough operating conditions - from the deserts of Rajasthan to the sand of Saudi Arabia.

Features:
Elegant Air End,Energy-saving design:
The heart of the Screw Air Compressor is the Airend, engineered for optimum performance and economy in operation.The energy-saving asymmetrical screw type rotors, mounted on anti-friction bearings, rotate at conservative speeds, compressing pulsation-free air in between lobe –flute spaces. Oil is continuously injected for cooling, lubricating and sealing between rotor tips and casing. Since the rotors do not touch each other, there is virtually no wear and tear.
Reliable Prime Mover:
A choice of rugged diesel engines known for their performance and well accepted in the market. So you get dependable service and good resale value.
Low oil consumption:
Two stage air/oil separator effectively separates oil from air. Oil is fed back into the system. So you get economical operation.
Air delivery matched to demand:
The 0-100% stepless variable capacity control reduces fuel consumption and operating costs. End use air consumption controls the opening and closing of the inlet valve, thereby regulating inlet air suction, and matching engine speed to demand. So you save on fuel, and you pay only for the air you use.
Easy Manouverability:
Reddy Compressors compressors are mounted on rugged trolleys, designed to meet the exacting demands of the construction and mining industry. So you can maneuver them even in the toughest terrains in India and abroad.
Low maintenance costs:
Reddy Compressors’s reliability proven design and economical spare parts keep your operating costs to the minimum.

DL 04 012 (300-100)- For construction & mining

DL 04 012 (300-100)- For construction & mining
Applications:
| Model |
Construction |
Mining |
Industry |
Water well |
| DL 03 007
(175 DPTR) |
Pipe cleaning, sand blasting, road and pavement breakers | Pipeline cleaning, standby air supply | ||
| DL 04 012
(300 DPTR) DH 04 012 (H 300 DPTR) |
Road and pavement breakers for patch work, jack hammers, sand-blasting | Jack hammers, line drills, jet burners, blast hole drilling | Standby
air supply |
|
| DL 05 016
(400 DPTR) |
Jack hammers, rock drills, pneumatic tools | Wagon drills
pneumatic tools |
Standby air supply | |
| DH 05 018
(H 450 DPTR) |
Wagon drills etc | 4" water well drilling | ||
| DL 06 024
(600 DPTR) |
Pneumatic tools, drifter drilling, rock tools etc. | Blast hole drilling and drifter drilling | Standby
air supply |
* Custom made skid models available for 6" water-well drilling application
Engineering Data |
|||||||||
|
Model |
FAD |
Nominal Working Pressure |
Engine |
Length |
Overall |
Overall Height |
Weight |
||
|
m3/min |
cfm |
kg/cm2 |
psig |
mm |
mm |
mm | kg |
||
| Trolley Mounted | |||||||||
4.96 |
175 |
7 |
100 |
HA 494 |
3650 |
2100 |
1900 | 1480 |
|
8.51 |
300 |
7 |
100 |
4 BT, 3.9 Cummins |
3160 |
1720 |
1932 | 1450 |
|
11.3 |
400 |
10.5 |
150 |
6 BTA |
4375 |
1620 |
2400 | 2410 |
|
12.77 |
450 |
10.5 |
150 |
6 BTA |
4375 |
1620 |
2400 | 2410 |
|
DV 06 026 |
18.4 |
650 |
14 |
200 |
6 CTA |
4450 |
2100 |
2537 | 4190 |
DH 06 030 |
21.3 |
750 |
8.7 |
125 |
6 CTA |
4450 |
2100 |
2537 | 4190 |
| Skid Mounted | |||||||||
DH 06 019 |
13.5 |
475 |
10.5 |
150 |
6 BTA |
2780 |
1100 |
1837 | 1800 |
DV 06 036 |
25.5 |
900 |
14.0 |
200 |
NTA 855 BC Cummins |
4570 |
1640 |
2350 |
5390 |
DX 23 030 |
21.3 |
750 |
17.5 |
250 |
NTA 855 BC Cummins |
4562 |
1844 |
2370 | 5890 |
DZ 23 036 |
25.5 |
900 |
24.6 |
350 |
KTA 1150 C Cummins |
4200 |
2100 |
2690 | 5990 |
DU 23 040 |
28.3 |
1000 |
19.3 |
275 |
NTA 855 BC Cummins |
4562 |
1844 |
2370 | 5890 |
DY 23 044 |
31.15 |
1100 |
21.1 |
300 |
NTA 855 BC Cummins |
4562 |
1844 |
2370 | 5220 |
31.1 |
1100 |
24.6 |
350 |
KTA 1150 C Cummins |
4300 |
2150 |
2770 | 6100 |
|
Note:
* The models included in the above table are our standard models and are for intermittent duty cycle
* For your requirements of non-standard models and continuous duty rating compressors, please contact us at our branch office nearest to you
* Due to constant engineering improvemnets, the above specifications are subject to chnage

Stationery Compressors
Automan AF/AC Series
KT Series
LE/LT 2-20
GX 2-11
GA 5-11
GA 5-11 VSD
GN 4-18
GAR 5-37
GA 11+ -30/ GA 18-30VSD
GA 30+-90/ GA37- 90VSD
GA 200-500
GA 90+ -160+ / GA 132-160 VSD
GA315 VSD
GR 110-200
Oil Free Compressors
LFx 0.7-2.0
LFx MED 0.7-2.0
LF 2-10
SF 1-15
SFR 4-8
AQ 30-55/ AQ 37-55 VSD
ZT15-22, ZT/ZR 30-45, ZR/ZT 22-37-55 VSD
ZR/ZT55-90 and ZR/ZT90 VSD
ZT/ZR 110-750 & ZR 132-900 VSD
ZB VSD
ZE/ZA 3-6 & ZE4VSD
HX/HN
PET COMPRESSORS
P-series reciprocating compressorsS-reciprocating booster
ZD 1200 - 4000 & VSD
Centrifugal Compressors
ZH4000-26000Portable Compressors
XAS 185 JD7 (HardHatTM & Steel)XAS 185 JDU6
XA(T)S 375 JD6
XA(T,H)S 70-185 KD7/DD7
XA(T,H)S 70-185 KD7/DD7 HardHat XAHS 250-300 DD7
XA(H,T,V)S 300-375 DD7
XA(M)(H)S 500-750 CD6
XA(M,T,H,V)S 500-850 CD7
XA(M,T,H,V)S 830-1150 CD6
XAS 1600 CD6XR(H,V)S 700-1100 CD6
XR(V,X)S 1200-1250 CD6
Twinair XAH 2250 & XRV 2000
XR(H,V)S 700-1100 CD6
XR(V,X)S 1200-1250 CD6
Twinair XAH 2250 & XRV 2000
XA(T,H)S 37-97
XA(T,H)S 37-97 HardHat
XA(H)S 107-137 Deutz
XA(H,V,T)S 146-186 Deutz
XA(M,T,H,V)S 237-407 Caterpillar
XA(M,T,H,V)S 396-546 Caterpillar
XAS 746 / XAS 1600 CD6
XR(H,V)S 336-506 Caterpillar
XR(V,X)S 566-606 Caterpillar
TwinAir XAH 1066 & XRV 946
OEM compressed air modules
Rental Equipment & Services
IndustryOil and Gas
Construction
Events
Major Projects
Training
Gallery
- 1
- 2
- 3
- 4
Clients



